COMMERCIAL & INDUSTRIAL SOLAR · BENGALURU & KARNATAKAFACTORIES · PEB SHEDS · TECH CAMPUSES · 1 MW+ ENQUIRIES

01 / COMMERCIAL & INDUSTRIAL INFRASTRUCTURE

High-demand roofs.
Engineered for daytime loads.

We engineer high-yield rooftop solar plants for manufacturing units, PEB warehouses, corporate buildings and 1 MW+ requirements — combining structural purlin safety with collateral-free Bill-to-EMI financing, 40% Accelerated Depreciation tax shields and verified ESG carbon reporting.

BENCHMARK YIELD
3.8 – 4.0 kWh / kWp / day
FINANCING
Collateral-free · 4–6 Yr EMI
TAX SHIELD
Up to 40% Accelerated Depr.
FIG C-01 / INDUSTRIAL PEB & RCC ROOFINGFEASIBILITY-LED EXECUTION
Large-scale commercial and industrial rooftop solar installation
Commercial & Industrial Reference Photograph
01 / PURLIN & TRUSS VERIFIED02 / WALKWAYS & LIFELINES03 / LT PANEL SYNCHRONISATION

ARCHITECTURAL CAD SIMULATION · INDUSTRIAL & COMMERCIAL FACILITY

From raw roof geometry to synchronised building power.

Scroll through the four engineering stages below or switch building topologies inside the CAD viewport. The procedural 3D model responds directly to your scroll position · illustrating LiDAR scanning, BOM staging, structural mounting and live solar-to-AC conversion.

01 / PEB ROOF & LT AUDIT
ARRAY ORIENTATION180.0° SOUTH
STRUCTURE GEOMETRY10.5° SHED PITCH
ELECTRICAL INTERFACELT PANEL / 415V 3-PHASE
TELEMETRY STATUSSCANNING INDUSTRIAL BAY
01STAGE 01 / INDUSTRIAL TRUSS & PURLIN LIDAR SCAN

Standing-seam profile, skylight corridors & LT switchgear audit

Laser survey of PEB metal-sheet pitch, purlin load capacity, north-light polycarbonate skylights, turbo-ventilator clearances and transformer LT panel capacity.

02STAGE 02 / HIGH-DENSITY BOM & CLAMP STAGING

Non-penetrating seam clamps, rails & multi-MPPT string inverters

Zero-penetration standing-seam clamps, extruded rail networks, high-wattage monocrystalline modules and industrial string inverters are staged above the structural purlin grid.

03STAGE 03 / ARRAY LOCK, WALKWAYS & GI CABLE TRAYS

High-density bay assembly, FRP walkways & perimeter lifelines

Modules lock across the pitched bays while preserving skylight strips and turbo vents. Perforated GI cable trays route high-voltage DC strings down to the inverter bay.

04STAGE 04 / DAYTIME LOAD COINCIDENCE & BUSBAR SYNC

Direct daytime machinery feed & peak tariff displacement

Collimated solar radiation drives massive DC harvest across both factory bays, converting at the inverter bank to feed daytime production loads directly at 3.8–4.0 units/kWp/day.

02 / CAPITAL ARCHITECTURE · THE BILL-TO-EMI SWAP

Switch to solar without locking up your working capital.

Why pay a perpetual monthly electricity tariff to the utility when that exact cash outflow can fund your own power plant — and become 100% debt-free in 4 to 6 years?

PHASE 01 · DAY 1₹0 to Low Initial Outlay

Zero or minimal upfront capital & collateral-free project loans

Preserve your working capital and credit lines. Eligible commercial and industrial entities can transition to rooftop solar through structured collateral-free financing or low-initial-outlay plans.

PHASE 02 · YEARS 1 TO 4–6Monthly EMI ≈ Current Bill Offset

The Bill-to-EMI Swap: Pay your EMI instead of your sunk BESCOM tariff

Because commercial daytime tariffs are steep, your monthly solar generation immediately offsets grid draw. Your structured monthly EMI is calibrated to sit close to the monthly electricity bill you were already paying.

PHASE 03 · YEAR 5–6 TO YEAR 25–3020–25+ Years Free Daytime Power

EMI ends. Enjoy 20–25+ years of virtually free daytime power

Once the 4-to-6-year loan tenure concludes, your EMI drops to zero. Your facility owns the solar power plant 100% outright — generating clean, near-zero-cost electricity for the remaining 25 to 30-year design life.

CFO ADVANTAGE · INCOME TAX ACT BENEFIT

Accelerated Depreciation (up to 40% in Year 1) compresses payback even further.

Profit-making commercial and industrial entities investing in rooftop solar assets can claim up to 40% Accelerated Depreciation under the Income Tax Act — creating a substantial Year-1 corporate tax shield alongside monthly tariff savings.

Calculate C&I ROI & Tax Shield below

03 / COMMERCIAL & INDUSTRIAL SIZING CALCULATOR

Calculate industrial plant capacity from monthly kWh consumption.

Enter your industrial or commercial facility's monthly consumption in units (kWh) to determine the ideal plant capacity and roof area.

INPUT INDUSTRIAL kWh BELOW:Enter monthly facility consumption in kWh to compute recommended PEB/RCC plant capacity.
ENTER UNITS
kWh / month
95%
INDUSTRIAL SIZING SPECIFICATION3.8 – 4.0 UNITS/kWp/DAY
RECOMMENDED INDUSTRIAL PLANT CAPACITY
150 kWp

To generate ~17,100 units/month

ESTIMATED MONTHLY GENERATION17,550 units / mo
APPROXIMATE PEB ROOF AREA14,250 sq. ft.

03 / COMMERCIAL CAPEX, 40% TAX SHIELD & 25-YEAR ROI GRAPH

Model your factory monthly kWh, Bill-to-EMI & accelerated payback.

Enter your monthly industrial kWh consumption. Evaluate Non-DCR high-wattage installations (₹55,000 to ₹60,000 per kWp + GST reference band), factor in the 40% Year-1 Accelerated Depreciation tax shield and compare your 4-to-6-year collateral-free EMI against your monthly daytime tariff.

INPUT YOUR VALUES BELOW:Enter your monthly electricity consumption in kWh (units) or adjust system capacity (kWp). Select DCR (with subsidy) vs Non-DCR (without subsidy) to generate your live investment graph.
PRIMARY INPUT

Enter monthly industrial kWh consumption from your HT/LT utility billing.

kWh / month
Recommended system size: 3.5 kWpUnshaded roof needed: 335 sq. ft.
PRICING TIER

DCR modules qualify for MNRE / PM Surya Ghar subsidy. Non-DCR modules offer lower base hardware outlay for open-market or commercial installations.

₹8.50 / unit

Default ₹7.00/unit for residential slabs; adjust to match your BESCOM tariff category.

5 Years (60 Months)

Pay a monthly EMI close to your current electricity bill for 4 to 6 years; enjoy free power for the remaining 20 to 25+ years.

*PROFESSIONAL PRICING NOTE: Reference bands of ~₹70,000/kWp + GST (DCR) and ~₹55,000–₹60,000/kWp + GST (Non-DCR) are upper indicative benchmarks. Actual negotiated project pricing is typically lower and depends site-to-site on structural elevation height, hot-dip galvanised steel tonnage, DC/AC cable run length and inverter topology.
INDICATIVE INVESTMENT, ROI & CARBON LEDGER4.8x LIFETIME ROI
INDICATIVE GROSS OUTLAY (+GST)₹2.39 LakhsDCR @ ~₹70k/kWp + 13.8% eff. GST
DIRECT GOVT SUBSIDY- ₹78,000PM Surya Ghar DCR Benefit
EFFECTIVE NET INVESTMENT₹1.61 LakhsPayback in ~4.4 Years
25-YEAR CUMULATIVE ELECTRICITY SAVINGS
₹8.82 Lakhs Saved

Generates ~360 units/mo · Saves ~₹2,520/mo (~₹30,240/yr in Year 1 with 3% annual tariff escalation)

RETURN MULTIPLE5.4xon net outlay
ZERO / LOW OUTLAY BILL-TO-EMI SWAP (COLLATERAL-FREE)
Monthly Solar Savings: ₹40,800/moIndicative 5-Yr EMI: ₹42,500/mo

After Year 5, your EMI drops to ₹0 and your facility enjoys 20+ years of free daytime power.

INVESTMENT VS. CUMULATIVE SAVINGS TRAJECTORY (₹ LAKHS)BREAKEVEN: YEAR 4.4
₹1.61L
Net Cost
₹1.60L
Year 5
₹3.46L
Year 10
₹5.62L
Year 15
₹8.82L
Year 25
CARBON FOOTPRINT & ENVIRONMENTAL IMPACT (INDIAN GRID: 0.82 tCO₂/MWh)
88.5 Tonnes CO₂3.54 Tonnes CO₂ avoided / year

Total carbon dioxide emissions prevented over 25 years

1,420 Mature Trees25-year forestry equivalent

Equal to planting & growing mature trees absorbing CO₂ for 25 years

38 Petrol Cars Off-Road~5.1 Lakh km petrol driving offset

Equivalent passenger cars removed from Bengaluru roads for a year

Send this exact system & ROI estimate on WhatsApp

05 / INDUSTRIAL ENGINEERING STANDARDS

Built for factory sheds, campuses and 1 MW+ scale.

Industrial roofs cannot tolerate roof leaks, skylight blockage or unsafe maintenance access. Every specification is preceded by a physical structural and electrical audit.

STANDARD 01 / STANDING-SEAM & TRAPEZOIDAL SHEDS

Zero-penetration seam clamps & wind-uplift engineering

Protecting factory waterproofing and purlin structural margins.

On standing-seam PEB roofs, we deploy non-penetrating mechanical seam clamps that grip the raised rib without drilling into the metal sheet. Array geometry leaves all north-light skylights and turbo ventilators unobstructed.

  • Purlin span & dead-load certification check prior to mounting
  • Dedicated FRP maintenance walkways & perimeter safety lifelines
  • Realistic 3.8 – 4.0 kWh/kWp/day generation modelling aligned with shift hours
STANDARD 02 / HIGH-CAPACITY & 1 MW+ ENQUIRIES

Transformer interface, HT/LT synchronisation & protection

Structured feasibility for large industrial & institutional loads.

For high-tension (HT) consumers and 1 MW+ enquiries, we evaluate transformer loading, reverse-power relay requirements, harmonic compliance and BESCOM/KPTCL evacuation feasibility before submitting a formal engineering proposal.

  • Perforated GI cable trays & armoured AC/DC industrial cabling
  • Multi-MPPT string inverters with remote SCADA/telemetry monitoring
  • All 1 MW+ enquiries subject to site feasibility & delivery assessment
06 / SCHEDULE A COMMERCIAL FEASIBILITY AUDITARYAMA · COMMERCIAL & INDUSTRIAL

Engineering & financial clarity

Request a site audit & Bill-to-EMI proposal.

Share your facility location, roof type (PEB metal sheet or RCC), sanctioned load and monthly kWh consumption. We will prepare a technical layout alongside a collateral-free EMI vs current-bill comparison.

DIRECT C&I DESK+91 86600 30997
HEADQUARTERS

Abhinand Gardenia, Manjunath Nagar, Ankappa Layout, Uttarahalli, Bengaluru 560061

Verified partnerships

Call +91 86600 30997WhatsApp